Potential BTO at Kallang Basin Swimming Complex, St Wilfred Sport Centre sites likely to be Plus flats: ERA Singapore

The ideas to seal the Kallang Basin and St Wilfred sports facilities for redevelopment are well-timed, considered that both sites are significantly older compared to many other sports complexes, notices Eugene Lim, key executive officer at ERA Singapore. “It makes sense for the places to lead the way for better land usage, particularly considered that they are situated fairly close to the city centre,” he includes.

The Kallang Basin Swimming Complex spot is within walking distance of Geylang Bahru MRT Station and the Geylang Bahru Market and Food Center. Lim notes that a lot of the public property blocks in the Geylang Bahru area were established in the 1970s, indicating a desire for brand-new developments that will invigorate the area.

Lim thinks that future Build-to-Order (BTO) projects at the site might be assigned as Plus flats due to their proximity to town and services. Plus apartments have tighter resale limitations compared to Standard type apartments, consisting of a longer minimal occupation era of 10 years and restrictions on renting out the flat.

The Sen condominium

He predicts the future BTO task at the site might feature a mix of 2- to four-room flats. “The neighboring sites have a plot ratio of 2.8, and assuming a quite similar plot ratio, we might see some high-rise BTO apartments, possibly approximately 36 storeys,” he adds.

At the same time, the St Wilfred Sport Centre is a 10-minute stroll from Boon Keng MRT Terminal. It stands close to St George’s Road, wherein many of the existing HDB apartments date back to the 1980s, according to Lim.

Locals will definitely have connection to a brand-new Sport-in-Precinct center in close-by Kolam Ayer, that is set to launch at the end of the year. On the other hand, plans to present housing project at the two sites are currently being researched, according to the agencies.

The Kallang Basin ActiveSG Swimming Complex and the St Wilfred ActiveSG Sports Centre will discontinue functions permanently in the 2nd half of 2025. On June 13, URA, HDB and Sport Singapore together announced the end of the centers upon their contract expiries. The Kallang Basin facility, located on Geylang Bahru Lane, will finalize on Sept 1, and the St Wilfred centre on St Wilfred Road will close on Oct 1.


error: Content is protected !!